About

Market

Operations

Insights

Contact

Schedule a Call

Next-Generation Infrastructure

You Supply the Ideas. We Build the AI Factory.

GR1D delivers fast, reliable inference infrastructure — from land and power to GPU-ready compute. Our first 20 MW site has live power, with 600 MW in the pipeline. You focus on the model. We handle everything else.

Build Your AI Factory Turnkey data center construction — 20 MW to 1 GW+

Host Servers Bespoke liquid-cooled colocation from $180/kW/month

Rent Compute Dedicated GPU rental for AI inference & training

600 MW

Pipeline Capacity

20 MW

Powered

6–⁠12 mo

Modular Build

What We Do

Vertically Integrated AI Infrastructure

GR1D controls every layer of the stack — from land and power to substation and compute — to deliver AI data centers faster: modular builds take 6–12 months once power is in place.

Own the Land

Acquire undervalued land in strategic locations with pre-secured transmission access across Texas. Two sites in South Houston plus East Austin and North Texas.

Secure Power

Power as low as 5.5¢/kWh at our Texas sites.

Deploy Fast

Modular builds take 6–12 months once power is in place, versus 18–36 months for a traditional build. Our first 20 MW site was powered on in under 30 days.

Source Direct

GR1D uses a global supply chain to drastically reduce lead times of long-lead electrical infrastructure.

What We're Building

South Houston 20 MW Live Power — AI Build Ready View site →

South Houston 150 MW Development Site View site →

East Austin 60 MW In Development View site →

North Texas 370 MW In Development View site →

Market Opportunity

The AI Infrastructure Gold Rush

Energy demand is surging while HPC infrastructure lags behind. GR1D is positioned at the intersection of this massive supply-demand gap.

AI Compute Demand Explosion

Global AI infrastructure spending is projected to exceed $500B by 2028. Every major cloud provider, sovereign government, and enterprise is racing to secure GPU capacity.

HPC Capacity Shortage

Demand for high-performance compute is outpacing available data center capacity by 3-5x. New facilities can't be built fast enough to meet the wave of AI training and inference workloads arriving by 2027.

Power Is the Bottleneck

Grid interconnection wait times now exceed 3-5 years in most U.S. markets. GR1D's Texas-first strategy works around this bottleneck with pre-secured transmission access and modular builds that take 6–12 months once power is in place.

Inference at the Edge

As AI models move from training to production, inference workloads are exploding — requiring distributed, low-latency compute at scale. GR1D's modular architecture is built for this shift.

Traction

Operational Milestones

From first power-on to a 600 MW pipeline — GR1D is executing at speed.

Q1 2025

20 MW South Houston site — live power secured

Q2 2025

150 MW South Houston development site — under contract

Q3 2025

60 MW East Austin site — development underway

Q4 2025

370 MW North Texas — site acquisition in progress

2027

60 MW East Austin site goes live

Q1 2028

150 MW South Houston campus goes live

2029

370 MW North Texas campus goes live — full 600 MW pipeline operational

The Shift

GR1D Controls Energy, Land, and Compute to Build What the Old System Cannot

Traditional Infrastructure

The old model waits on everyone else

The GR1D Solution

A model built for speed and availability

GR1D Insights

How AI Data Centers Actually Get Built

Numbers-first field guides on power, timelines, cost and cooling, every figure sourced, from the team developing AI data centers in Texas.

Economics · 12 min read Data Center Cost per MW in 2026: The Full Stack Data center cost per megawatt in 2026: $17.6M all-in before GPUs, $11.3M shell and core, $9–16M in Texas, plus $29–42M per MW of GPUs, stacked by stage. Read the guide

Development · 14 min read How a Data Center Is Built: 12 Phases, 18–30 Months How a data center is built in 12 phases: the building takes 18–30 months, grid power 4+ years. Every phase, gate and cost, with 2026 sources. Read the guide

Development · 13 min read How Long It Takes to Build a Data Center in 2026 How long does it take to build a data center in 2026? Best, typical and slipped timelines: 18-month builds, 4-year grid waits, 128-week transformers. Read the guide

Power · 14 min read ERCOT Large-Load Interconnection, SB 6 and Batch Zero ERCOT large load interconnection as of Oct 2026: the 75 MW line, $100k fee, $50k/MW security, Batch Zero, SB 6 and both Texas pauses, gate by gate. Read the guide

Design · 14 min read Liquid Cooling for GPUs: Why Air Stops Near 40 kW Liquid cooling data center guide: why air stops near 40 kW, direct-to-chip vs immersion, CDU flow math, 45 °C loops and Texas water rules for AI racks. Read the guide

Design · 11 min read 800 VDC Data Centers and Vera Rubin, Explained 800V DC data center design for developers: why 54 V fails at 1 MW per rack, NVIDIA's 2026–2029 roadmap, NEC 2026, cost per MW and a shell checklist. Read the guide

All GR1D Insights

Get Started

Ready to Secure Your Capacity?

The AI infrastructure window is closing fast. Submit your requirements and our team will respond within 24 hours with a custom proposal.

Prefer to Talk?

Skip the form. Schedule a 30-minute call with our infrastructure team to discuss your requirements directly.

Schedule a Call

Why Act Now

6–⁠12 months modular build once power is in place

As low as 5.5¢/kWh power

20 MW live today

600 MW total pipeline

Or email us directly

info@gr1d.us

AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.

GR1D on LinkedIn

GR1D on YouTube

GR1D on Instagram

Products

Build Your AI Factory

Host Servers

Rent Compute

Company

About GR1D

Operations

Market

Sites

FAQ

Insights

Get in Touch

Schedule a Call

info@gr1d.us

South Houston, TX

© 2026 GR1D. All rights reserved.

AI Data Center Infrastructure — Build, Host, Compute