Next-Generation Infrastructure
GR1D delivers fast, reliable inference infrastructure — from land and power to GPU-ready compute. Our first 20 MW site has live power, with 600 MW in the pipeline. You focus on the model. We handle everything else.
Build Your AI Factory Turnkey data center construction — 20 MW to 1 GW+
Host Servers Bespoke liquid-cooled colocation from $180/kW/month
Rent Compute Dedicated GPU rental for AI inference & training
600 MW
Pipeline Capacity
20 MW
Powered
6–12 mo
Modular Build
What We Do
GR1D controls every layer of the stack — from land and power to substation and compute — to deliver AI data centers faster: modular builds take 6–12 months once power is in place.
Acquire undervalued land in strategic locations with pre-secured transmission access across Texas. Two sites in South Houston plus East Austin and North Texas.
Power as low as 5.5¢/kWh at our Texas sites.
Modular builds take 6–12 months once power is in place, versus 18–36 months for a traditional build. Our first 20 MW site was powered on in under 30 days.
GR1D uses a global supply chain to drastically reduce lead times of long-lead electrical infrastructure.
South Houston 20 MW Live Power — AI Build Ready View site →
South Houston 150 MW Development Site View site →
East Austin 60 MW In Development View site →
North Texas 370 MW In Development View site →
Market Opportunity
Energy demand is surging while HPC infrastructure lags behind. GR1D is positioned at the intersection of this massive supply-demand gap.
Global AI infrastructure spending is projected to exceed $500B by 2028. Every major cloud provider, sovereign government, and enterprise is racing to secure GPU capacity.
Demand for high-performance compute is outpacing available data center capacity by 3-5x. New facilities can't be built fast enough to meet the wave of AI training and inference workloads arriving by 2027.
Grid interconnection wait times now exceed 3-5 years in most U.S. markets. GR1D's Texas-first strategy works around this bottleneck with pre-secured transmission access and modular builds that take 6–12 months once power is in place.
As AI models move from training to production, inference workloads are exploding — requiring distributed, low-latency compute at scale. GR1D's modular architecture is built for this shift.
Traction
From first power-on to a 600 MW pipeline — GR1D is executing at speed.
Q1 2025
20 MW South Houston site — live power secured
Q2 2025
150 MW South Houston development site — under contract
Q3 2025
60 MW East Austin site — development underway
Q4 2025
370 MW North Texas — site acquisition in progress
2027
60 MW East Austin site goes live
Q1 2028
150 MW South Houston campus goes live
2029
370 MW North Texas campus goes live — full 600 MW pipeline operational
The Shift
The old model waits on everyone else
A model built for speed and availability
GR1D Insights
Numbers-first field guides on power, timelines, cost and cooling, every figure sourced, from the team developing AI data centers in Texas.
Get Started
The AI infrastructure window is closing fast. Submit your requirements and our team will respond within 24 hours with a custom proposal.
Skip the form. Schedule a 30-minute call with our infrastructure team to discuss your requirements directly.
6–12 months modular build once power is in place
As low as 5.5¢/kWh power
20 MW live today
600 MW total pipeline
Or email us directly
AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.
South Houston, TX