Live Power — AI build ready — modules ~6 months from order
Live power today. Liquid-cooled colocation modules deliver about 6 months from order.
20 MW
live power — AI build ready — modules ~6 months from order
As low as 5.5¢/kWh
power on long-term contracts — insulated from market volatility
6–12 Months
modular build once power is in place
Houston, Texas (ERCOT)
deregulated ERCOT market — site selected for transmission access
Overview
GR1D's South Houston 20 MW site is the live-power anchor of our 600 MW Texas pipeline. Power is live, the site is AI build ready, and it was energized in under 30 days — proof of the modular, vertically integrated model behind every GR1D project.
The site offers bespoke liquid-cooled colocation from $180/kW/month, with 50–100+ kW per rack and N+1 redundancy. Data center modules are built to your spec and deliver about 6 months from order, so reserve rack space now for liquid-cooled GB300 and Vera Rubin.
Energized in under 30 days — power is live today, not a projection
Power as low as 5.5¢/kWh, insulated from ERCOT market volatility
Liquid-cooled colocation modules for GB300 and Vera Rubin, about 6 months from order
Owned infrastructure: land, power and modules under one operator
Pilot capacity for customers scaling toward the 150 MW South Houston campus
Capacity
20 MW
Status
Live power — AI build ready
Power cost
As low as 5.5¢/kWh
Market
Houston, Texas — ERCOT
Rack density
50–100+ kW per rack
Cooling
Direct-to-chip liquid cooling
Redundancy
N+1
Availability
Liquid-cooled colocation from $180/kW/month; modules ~6 months from order
GPU colocation (Host Servers)
Dedicated compute rental
Pilot deployments ahead of campus-scale builds
Timeline
Q1 2025
20 MW South Houston site — live power secured
2025
Site AI build ready
Q1 2028
Adjacent 150 MW South Houston campus goes live
More Sites
South Houston 150 MW Development Under contract — Phase 1 buildout
East Austin 60 MW Development Site development underway
North Texas 370 MW Acquisition Site acquisition in progress
Get Started
Submit your requirements and our team will respond within 24 hours with availability, pricing and timeline.
Schedule a 30-minute call with our infrastructure team to discuss this site, timelines and your workload.
Or email us directly
AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.
South Houston, TX
© 2026 GR1D. All rights reserved.
AI Data Center Infrastructure — Build, Host, Compute