About

Market

Operations

Insights

Contact

Schedule a Call

All sites

Live Power — AI build ready — modules ~6 months from order

South Houston 20 MW AI Data Center — Houston, Texas (ERCOT)

Live power today. Liquid-cooled colocation modules deliver about 6 months from order.

Request Availability

Schedule a Call

Site at a Glance

20 MW

live power — AI build ready — modules ~6 months from order

As low as 5.5¢/kWh

power on long-term contracts — insulated from market volatility

6–⁠12 Months

modular build once power is in place

Houston, Texas (ERCOT)

deregulated ERCOT market — site selected for transmission access

Overview

South Houston 20 MW

GR1D's South Houston 20 MW site is the live-power anchor of our 600 MW Texas pipeline. Power is live, the site is AI build ready, and it was energized in under 30 days — proof of the modular, vertically integrated model behind every GR1D project.

The site offers bespoke liquid-cooled colocation from $180/kW/month, with 50–100+ kW per rack and N+1 redundancy. Data center modules are built to your spec and deliver about 6 months from order, so reserve rack space now for liquid-cooled GB300 and Vera Rubin.

Why this site

Energized in under 30 days — power is live today, not a projection

Power as low as 5.5¢/kWh, insulated from ERCOT market volatility

Liquid-cooled colocation modules for GB300 and Vera Rubin, about 6 months from order

Owned infrastructure: land, power and modules under one operator

Pilot capacity for customers scaling toward the 150 MW South Houston campus

Specifications

Capacity

20 MW

Status

Live power — AI build ready

Power cost

As low as 5.5¢/kWh

Market

Houston, Texas — ERCOT

Rack density

50–100+ kW per rack

Cooling

Direct-to-chip liquid cooling

Redundancy

N+1

Availability

Liquid-cooled colocation from $180/kW/month; modules ~6 months from order

Best fit for

GPU colocation (Host Servers)

Dedicated compute rental

Pilot deployments ahead of campus-scale builds

Timeline

Milestones

Q1 2025

20 MW South Houston site — live power secured

2025

Site AI build ready

Q1 2028

Adjacent 150 MW South Houston campus goes live

More Sites

600 MW Pipeline Across Texas

View all sites

South Houston 150 MW Development Under contract — Phase 1 buildout

East Austin 60 MW Development Site development underway

North Texas 370 MW Acquisition Site acquisition in progress

Get Started

Secure Capacity at South Houston 20 MW

Submit your requirements and our team will respond within 24 hours with availability, pricing and timeline.

Prefer to Talk?

Schedule a 30-minute call with our infrastructure team to discuss this site, timelines and your workload.

Schedule a Call

Or email us directly

info@gr1d.us

AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.

GR1D on LinkedIn

GR1D on YouTube

GR1D on Instagram

Products

Build Your AI Factory

Host Servers

Rent Compute

Company

About GR1D

Operations

Market

Sites

FAQ

Insights

Get in Touch

Schedule a Call

info@gr1d.us

South Houston, TX

© 2026 GR1D. All rights reserved.

AI Data Center Infrastructure — Build, Host, Compute