About
Market
Operations
Insights
Contact
Schedule a Call
Texas · ERCOT · Owned Land & Power
600 MW of AI Data Center Sites Across Texas
Four strategic locations selected for power availability, transmission access and speed to energize — from a live 20 MW site in South Houston to a 370 MW flagship campus in North Texas.
Build Your AI Factory
Schedule a Call
Houston, Texas (ERCOT) South Houston 20 MW Live Power Live power today. Liquid-cooled colocation modules deliver about 6 months from order. Energized in under 30 days — power is live today, not a projection Power as low as 5.5¢/kWh, insulated from ERCOT market volatility Liquid-cooled colocation modules for GB300 and Vera Rubin, about 6 months from order View site details
Houston, Texas (ERCOT) South Houston 150 MW Development Campus-scale capacity next to our operating facility. Adjacent to the live-power 20 MW site — proven power, team and supply chain Build-to-suit campus design from 50 MW to the full 150 MW Pre-secured transmission access; target go-live Q1 2028 View site details
Austin, Texas (ERCOT) East Austin 60 MW Development Central Texas capacity in the Austin technology corridor. Proximity to Austin's AI and semiconductor talent base Right-sized for dedicated single-tenant AI factories (20–60 MW) Pre-secured transmission access on owned land View site details
North Texas (ERCOT) North Texas 370 MW Acquisition The flagship of the 600 MW pipeline. Largest block of planned capacity in the GR1D pipeline Phased campus plan from first energization to full 370 MW Owned land and power View site details
Why Texas
Power Is the Bottleneck. We Own It.
Grid interconnection wait times exceed 3-5 years in most U.S. markets. GR1D's Texas-first strategy was built around that constraint: power and transmission access come first at every site.
Power as low as 5.5¢/kWh
Long-term power contracts and on-site substations insulate every site from volatile energy markets.
6–12 month modular builds
Once power is in place, modular construction takes 6–12 months. Transmission access is part of every site selection.
Owned land and power
GR1D owns the land, the power and the facilities.
Ready to Secure Capacity?
Tell us your capacity, timeline and workload — our team responds within 24 hours with site options and pricing.
Submit Requirements
Schedule a Call
AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.
GR1D on LinkedIn
GR1D on YouTube
GR1D on Instagram
Products
Build Your AI Factory
Host Servers
Rent Compute
Company
About GR1D
Operations
Market
Sites
FAQ
Insights
Get in Touch
Schedule a Call
info@gr1d.us
South Houston, TX
© 2026 GR1D. All rights reserved.
AI Data Center Infrastructure — Build, Host, Compute