About

Market

Operations

Insights

Contact

Schedule a Call

Texas · ERCOT · Owned Land & Power

600 MW of AI Data Center Sites Across Texas

Four strategic locations selected for power availability, transmission access and speed to energize — from a live 20 MW site in South Houston to a 370 MW flagship campus in North Texas.

Build Your AI Factory

Schedule a Call

Houston, Texas (ERCOT) South Houston 20 MW Live Power Live power today. Liquid-cooled colocation modules deliver about 6 months from order. Energized in under 30 days — power is live today, not a projection Power as low as 5.5¢/kWh, insulated from ERCOT market volatility Liquid-cooled colocation modules for GB300 and Vera Rubin, about 6 months from order View site details

Houston, Texas (ERCOT) South Houston 150 MW Development Campus-scale capacity next to our operating facility. Adjacent to the live-power 20 MW site — proven power, team and supply chain Build-to-suit campus design from 50 MW to the full 150 MW Pre-secured transmission access; target go-live Q1 2028 View site details

Austin, Texas (ERCOT) East Austin 60 MW Development Central Texas capacity in the Austin technology corridor. Proximity to Austin's AI and semiconductor talent base Right-sized for dedicated single-tenant AI factories (20–60 MW) Pre-secured transmission access on owned land View site details

North Texas (ERCOT) North Texas 370 MW Acquisition The flagship of the 600 MW pipeline. Largest block of planned capacity in the GR1D pipeline Phased campus plan from first energization to full 370 MW Owned land and power View site details

Why Texas

Power Is the Bottleneck. We Own It.

Grid interconnection wait times exceed 3-5 years in most U.S. markets. GR1D's Texas-first strategy was built around that constraint: power and transmission access come first at every site.

Power as low as 5.5¢/kWh

Long-term power contracts and on-site substations insulate every site from volatile energy markets.

6–⁠12 month modular builds

Once power is in place, modular construction takes 6–12 months. Transmission access is part of every site selection.

Owned land and power

GR1D owns the land, the power and the facilities.

Ready to Secure Capacity?

Tell us your capacity, timeline and workload — our team responds within 24 hours with site options and pricing.

Submit Requirements

Schedule a Call

AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.

GR1D on LinkedIn

GR1D on YouTube

GR1D on Instagram

Products

Build Your AI Factory

Host Servers

Rent Compute

Company

About GR1D

Operations

Market

Sites

FAQ

Insights

Get in Touch

Schedule a Call

info@gr1d.us

South Houston, TX

© 2026 GR1D. All rights reserved.

AI Data Center Infrastructure — Build, Host, Compute