Development — Under contract — Phase 1 buildout

South Houston 150 MW AI Data Center — Houston, Texas (ERCOT)

Campus-scale capacity next to our operating facility.

Request Availability

Schedule a Call

Site at a Glance

150 MW

development — under contract — phase 1 buildout

As low as 5.5¢/kWh

power on long-term contracts — insulated from market volatility

6–⁠12 Months

modular build once power is in place

Houston, Texas (ERCOT)

deregulated ERCOT market — site selected for transmission access

Overview

South Houston 150 MW

The South Houston 150 MW development site extends GR1D's operating footprint into a campus-scale AI data center. The site is under contract with Phase 1 buildout underway, designed for hyperscale and sovereign AI customers that need 50–150 MW of dedicated, GPU-dense capacity.

Like every GR1D site, it is built on owned land with pre-secured transmission access — compressing the typical 18–36 month construction timeline to 6–12 months once power is in place.

Why this site

Adjacent to the live-power 20 MW site — proven power, team and supply chain

Build-to-suit campus design from 50 MW to the full 150 MW

Pre-secured transmission access; target go-live Q1 2028

Direct OEM procurement for GPU, networking and cooling equipment

Owned land and power, not leased capacity

Specifications

Capacity

150 MW

Status

Under contract — Phase 1 buildout

Power cost

As low as 5.5¢/kWh

Market

Houston, Texas — ERCOT

Target go-live

Q1 2028

Build model

Modular, build-to-suit

Cooling

Liquid-cooling ready design

Ideal customer

Hyperscalers, sovereign AI, AI companies

Best fit for

Build Your AI Factory (turnkey campus)

Large-block colocation

Sovereign AI infrastructure

Timeline

Milestones

Q2 2025

150 MW South Houston development site — under contract

Q1 2028

150 MW campus goes live

More Sites

600 MW Pipeline Across Texas

View all sites

South Houston 20 MW Live Power AI build ready — modules ~6 months from order

East Austin 60 MW Development Site development underway

North Texas 370 MW Acquisition Site acquisition in progress

Get Started

Secure Capacity at South Houston 150 MW

Submit your requirements and our team will respond within 24 hours with availability, pricing and timeline.

Prefer to Talk?

Schedule a 30-minute call with our infrastructure team to discuss this site, timelines and your workload.

Schedule a Call

Or email us directly

info@gr1d.us

AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.

GR1D on LinkedIn

GR1D on YouTube

GR1D on Instagram

Products

Build Your AI Factory

Host Servers

Rent Compute

Company

About GR1D

Operations

Market

Sites

FAQ

Insights

Get in Touch

Schedule a Call

info@gr1d.us

South Houston, TX

© 2026 GR1D. All rights reserved.

AI Data Center Infrastructure — Build, Host, Compute