Development — Under contract — Phase 1 buildout
Campus-scale capacity next to our operating facility.
150 MW
development — under contract — phase 1 buildout
As low as 5.5¢/kWh
power on long-term contracts — insulated from market volatility
6–12 Months
modular build once power is in place
Houston, Texas (ERCOT)
deregulated ERCOT market — site selected for transmission access
Overview
The South Houston 150 MW development site extends GR1D's operating footprint into a campus-scale AI data center. The site is under contract with Phase 1 buildout underway, designed for hyperscale and sovereign AI customers that need 50–150 MW of dedicated, GPU-dense capacity.
Like every GR1D site, it is built on owned land with pre-secured transmission access — compressing the typical 18–36 month construction timeline to 6–12 months once power is in place.
Adjacent to the live-power 20 MW site — proven power, team and supply chain
Build-to-suit campus design from 50 MW to the full 150 MW
Pre-secured transmission access; target go-live Q1 2028
Direct OEM procurement for GPU, networking and cooling equipment
Owned land and power, not leased capacity
Capacity
150 MW
Status
Under contract — Phase 1 buildout
Power cost
As low as 5.5¢/kWh
Market
Houston, Texas — ERCOT
Target go-live
Q1 2028
Build model
Modular, build-to-suit
Cooling
Liquid-cooling ready design
Ideal customer
Hyperscalers, sovereign AI, AI companies
Build Your AI Factory (turnkey campus)
Large-block colocation
Sovereign AI infrastructure
Timeline
Q2 2025
150 MW South Houston development site — under contract
Q1 2028
150 MW campus goes live
More Sites
South Houston 20 MW Live Power AI build ready — modules ~6 months from order
East Austin 60 MW Development Site development underway
North Texas 370 MW Acquisition Site acquisition in progress
Get Started
Submit your requirements and our team will respond within 24 hours with availability, pricing and timeline.
Schedule a 30-minute call with our infrastructure team to discuss this site, timelines and your workload.
Or email us directly
AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.
South Houston, TX