Acquisition — Site acquisition in progress

North Texas 370 MW AI Data Center — North Texas (ERCOT)

The flagship of the 600 MW pipeline.

Request Availability

Schedule a Call

Site at a Glance

370 MW

acquisition — site acquisition in progress

As low as 5.5¢/kWh

power on long-term contracts — insulated from market volatility

6–⁠12 Months

modular build once power is in place

North Texas (ERCOT)

deregulated ERCOT market — site selected for transmission access

Overview

North Texas 370 MW

North Texas is GR1D's largest planned site: 370 MW of AI data center capacity, with site acquisition in progress. It is designed for the biggest requirements in the market — hyperscale training campuses, sovereign AI programs and strategic partners.

GR1D selects North Texas land for the same reasons as every site in the pipeline: power availability, transmission access and speed to energize — the three constraints that stall most data center projects for years.

Why this site

Largest block of planned capacity in the GR1D pipeline

Phased campus plan from first energization to full 370 MW

Owned land and power

Structured for strategic partnerships

Specifications

Capacity

370 MW

Status

Site acquisition in progress

Power cost

As low as 5.5¢/kWh (target)

Market

North Texas — ERCOT

Target go-live

2029

Build model

Multi-phase campus

Cooling

Liquid-cooling ready design

Ideal customer

Hyperscalers, sovereign AI, strategic partners

Best fit for

Hyperscale AI factory campus

Sovereign AI infrastructure

Strategic partnership

Timeline

Milestones

Q4 2025

370 MW North Texas — site acquisition in progress

2029

370 MW campus goes live — full 600 MW pipeline operational

More Sites

600 MW Pipeline Across Texas

View all sites

South Houston 20 MW Live Power AI build ready — modules ~6 months from order

South Houston 150 MW Development Under contract — Phase 1 buildout

East Austin 60 MW Development Site development underway

Get Started

Secure Capacity at North Texas 370 MW

Submit your requirements and our team will respond within 24 hours with availability, pricing and timeline.

Prefer to Talk?

Schedule a 30-minute call with our infrastructure team to discuss this site, timelines and your workload.

Schedule a Call

Or email us directly

info@gr1d.us

AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.

GR1D on LinkedIn

GR1D on YouTube

GR1D on Instagram

Products

Build Your AI Factory

Host Servers

Rent Compute

Company

About GR1D

Operations

Market

Sites

FAQ

Insights

Get in Touch

Schedule a Call

info@gr1d.us

South Houston, TX

© 2026 GR1D. All rights reserved.

AI Data Center Infrastructure — Build, Host, Compute