About

Market

Operations

Insights

Contact

Schedule a Call

All sites

Development — Site development underway

East Austin 60 MW AI Data Center — Austin, Texas (ERCOT)

Central Texas capacity in the Austin technology corridor.

Request Availability

Schedule a Call

Site at a Glance

60 MW

development — site development underway

As low as 5.5¢/kWh

power on long-term contracts — insulated from market volatility

6–⁠12 Months

modular build once power is in place

Austin, Texas (ERCOT)

deregulated ERCOT market — site selected for transmission access

Overview

East Austin 60 MW

GR1D's East Austin 60 MW site brings dedicated AI infrastructure to Central Texas, serving AI companies and enterprises that want compute close to Austin's technology ecosystem. Site development is underway.

The site follows the GR1D model: strategically acquired land with pre-secured transmission access, long-term power at rates as low as 5.5¢/kWh, and a modular build designed for high-density GPU workloads.

Why this site

Proximity to Austin's AI and semiconductor talent base

Right-sized for dedicated single-tenant AI factories (20–60 MW)

Pre-secured transmission access on owned land

Low-latency Central Texas location for inference workloads

Specifications

Capacity

60 MW

Status

In development

Power cost

As low as 5.5¢/kWh

Market

Austin, Texas — ERCOT

Target go-live

2027

Build model

Modular, GPU-optimized

Cooling

Liquid-cooling ready design

Ideal customer

AI companies, enterprises, inference at the edge

Best fit for

Build Your AI Factory (single-tenant)

Inference at the edge

Enterprise AI capacity

Timeline

Milestones

Q3 2025

60 MW East Austin site — development underway

2027

60 MW site goes live

More Sites

600 MW Pipeline Across Texas

View all sites

South Houston 20 MW Live Power AI build ready — modules ~6 months from order

South Houston 150 MW Development Under contract — Phase 1 buildout

North Texas 370 MW Acquisition Site acquisition in progress

Get Started

Secure Capacity at East Austin 60 MW

Submit your requirements and our team will respond within 24 hours with availability, pricing and timeline.

Prefer to Talk?

Schedule a 30-minute call with our infrastructure team to discuss this site, timelines and your workload.

Schedule a Call

Or email us directly

info@gr1d.us

AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.

GR1D on LinkedIn

GR1D on YouTube

GR1D on Instagram

Products

Build Your AI Factory

Host Servers

Rent Compute

Company

About GR1D

Operations

Market

Sites

FAQ

Insights

Get in Touch

Schedule a Call

info@gr1d.us

South Houston, TX

© 2026 GR1D. All rights reserved.

AI Data Center Infrastructure — Build, Host, Compute