Turnkey AI Data Center Construction
From raw land to GPU-ready racks, with modular builds of 6–12 months once power is in place. GR1D handles site acquisition, power interconnection, substation construction, and facility buildout — so you can focus on deploying AI at scale.
6–12 Months
per modular phase once power is in place, vs. 18–36 months for a traditional build
As low as 5.5¢/kWh
power on long-term contracts — insulated from market volatility
20 MW – 1 GW+
scalable capacity from single facility to campus-scale
Texas ERCOT
deregulated market — sites selected for transmission access
How It Works
Our vertically integrated, modular model compresses the typical 18–36 month data center construction timeline to 6–12 months once power is in place.
01
Weeks 1–4
We identify and acquire strategic land parcels with pre-secured transmission access, favorable zoning, and proximity to fiber backbone. Our Texas-first strategy targets sites where power is available now — not in 3 years.
02
Months 1–6
GR1D secures long-term power purchase agreements at rates as low as 5.5¢/kWh and builds dedicated substations on-site. We target sites with transmission access to shorten the multi-year grid waits that stall most data center projects. A global supply chain drastically reduces lead times on long-lead electrical infrastructure: long-standing relationships with factories mean custom transformers and switchgear get prioritized.
03
Months 3–10
Purpose-built modular data center construction optimized for high-density GPU workloads. Liquid cooling infrastructure, N+1 redundancy, and scalable rack layouts — designed for AI training and inference from day one.
04
Month 10–12
Full commissioning, testing, and handover of your GPU-ready facility. Move in with your hardware or leverage GR1D's OEM procurement relationships for direct-from-manufacturer pricing on NVIDIA and networking equipment.
The Advantage
| Factor | Traditional Build | GR1D Build |
|---|---|---|
| Build Time | 18–36 months | 6–12 months once powered |
| Grid Interconnection | 3–5 year queue | Sites chosen for transmission access |
| Power Cost | 6–12¢/kWh | As low as 5.5¢/kWh |
| Land Ownership | Leased | Owned |
| Vertical Integration | Multiple vendors | Single provider |
| Cooling | Air only | Liquid-cooling ready |
| Scale Range | Fixed capacity | 20 MW – 1 GW+ |
| OEM Procurement | Through resellers | Direct from manufacturer |
Who This Is For
Need 50–500+ MW of AI-ready capacity? GR1D delivers build-to-suit campuses on Texas sites selected for power and transmission access, with go-live dates from 2027.
Governments and national AI initiatives requiring dedicated, secure infrastructure on owned land with dedicated power supply and data sovereignty.
Scaling from cloud to owned infrastructure. Build a dedicated AI factory tailored to your training and inference workloads.
Landowners, utilities and infrastructure partners working with GR1D across its 600 MW Texas pipeline.
Active Sites
Strategic locations selected for power availability, fiber connectivity, and speed to energize.
South Houston 20 MW Live Power AI build ready — modules ~6 months from order View site →
South Houston 150 MW Development Under contract — Phase 1 buildout View site →
East Austin 60 MW Development Site development underway View site →
North Texas 370 MW Acquisition Site acquisition in progress View site →
Plan your build
Get Started
Tell us about your AI infrastructure requirements and our team will deliver a custom build proposal within 48 hours.
Schedule a 30-minute call to discuss your requirements, timeline, and site options with our infrastructure engineering team.
Custom site and capacity proposal
Power cost and timeline analysis
Facility design specifications
OEM procurement options
Financial model and ROI projection
Or email us directly
AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.
South Houston, TX
© 2026 GR1D. All rights reserved.
AI Data Center Infrastructure — Build, Host, Compute