About

Market

Operations

Insights

Contact

Schedule a Call

Turnkey AI Data Center Construction

Build Your AI Factory

From raw land to GPU-ready racks, with modular builds of 6–12 months once power is in place. GR1D handles site acquisition, power interconnection, substation construction, and facility buildout — so you can focus on deploying AI at scale.

Get a Custom Proposal

Schedule a Call

Why Enterprises Choose GR1D

6–⁠12 Months

per modular phase once power is in place, vs. 18–36 months for a traditional build

As low as 5.5¢/kWh

power on long-term contracts — insulated from market volatility

20 MW – 1 GW+

scalable capacity from single facility to campus-scale

Texas ERCOT

deregulated market — sites selected for transmission access

How It Works

From Raw Land to GPU-Ready Racks

Our vertically integrated, modular model compresses the typical 18–36 month data center construction timeline to 6–12 months once power is in place.

01

Site Acquisition & Due Diligence

Weeks 1–4

We identify and acquire strategic land parcels with pre-secured transmission access, favorable zoning, and proximity to fiber backbone. Our Texas-first strategy targets sites where power is available now — not in 3 years.

02

Power Interconnection & Substation

Months 1–6

GR1D secures long-term power purchase agreements at rates as low as 5.5¢/kWh and builds dedicated substations on-site. We target sites with transmission access to shorten the multi-year grid waits that stall most data center projects. A global supply chain drastically reduces lead times on long-lead electrical infrastructure: long-standing relationships with factories mean custom transformers and switchgear get prioritized.

03

Modular Facility Construction

Months 3–10

Purpose-built modular data center construction optimized for high-density GPU workloads. Liquid cooling infrastructure, N+1 redundancy, and scalable rack layouts — designed for AI training and inference from day one.

04

Commissioning & Handover

Month 10–12

Full commissioning, testing, and handover of your GPU-ready facility. Move in with your hardware or leverage GR1D's OEM procurement relationships for direct-from-manufacturer pricing on NVIDIA and networking equipment.

The Advantage

Why Build with GR1D?

FactorTraditional BuildGR1D Build
Build Time18–36 months6–⁠12 months once powered
Grid Interconnection3–5 year queueSites chosen for transmission access
Power Cost6–⁠12¢/kWhAs low as 5.5¢/kWh
Land OwnershipLeasedOwned
Vertical IntegrationMultiple vendorsSingle provider
CoolingAir onlyLiquid-cooling ready
Scale RangeFixed capacity20 MW – 1 GW+
OEM ProcurementThrough resellersDirect from manufacturer

Who This Is For

Built for Scale-Driven Organizations

Hyperscalers & Cloud Providers

Need 50–500+ MW of AI-ready capacity? GR1D delivers build-to-suit campuses on Texas sites selected for power and transmission access, with go-live dates from 2027.

Sovereign AI Programs

Governments and national AI initiatives requiring dedicated, secure infrastructure on owned land with dedicated power supply and data sovereignty.

AI Companies & Startups

Scaling from cloud to owned infrastructure. Build a dedicated AI factory tailored to your training and inference workloads.

Strategic Partners

Landowners, utilities and infrastructure partners working with GR1D across its 600 MW Texas pipeline.

Active Sites

600 MW Pipeline Across Texas

Strategic locations selected for power availability, fiber connectivity, and speed to energize.

South Houston 20 MW Live Power AI build ready — modules ~6 months from order View site →

South Houston 150 MW Development Under contract — Phase 1 buildout View site →

East Austin 60 MW Development Site development underway View site →

North Texas 370 MW Acquisition Site acquisition in progress View site →

Plan your build

Before You Break Ground

Development · 14 min read How a Data Center Is Built: 12 Phases, 18–30 Months How a data center is built in 12 phases: the building takes 18–30 months, grid power 4+ years. Every phase, gate and cost, with 2026 sources. Read the guide

Development · 13 min read How Long It Takes to Build a Data Center in 2026 How long does it take to build a data center in 2026? Best, typical and slipped timelines: 18-month builds, 4-year grid waits, 128-week transformers. Read the guide

Economics · 12 min read Data Center Cost per MW in 2026: The Full Stack Data center cost per megawatt in 2026: $17.6M all-in before GPUs, $11.3M shell and core, $9–16M in Texas, plus $29–42M per MW of GPUs, stacked by stage. Read the guide

All GR1D Insights

Get Started

Request a Custom Proposal

Tell us about your AI infrastructure requirements and our team will deliver a custom build proposal within 48 hours.

Talk to Our Build Team

Schedule a 30-minute call to discuss your requirements, timeline, and site options with our infrastructure engineering team.

Schedule a Call

What You Get

Custom site and capacity proposal

Power cost and timeline analysis

Facility design specifications

OEM procurement options

Financial model and ROI projection

Or email us directly

info@gr1d.us

AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.

GR1D on LinkedIn

GR1D on YouTube

GR1D on Instagram

Products

Build Your AI Factory

Host Servers

Rent Compute

Company

About GR1D

Operations

Market

Sites

FAQ

Insights

Get in Touch

Schedule a Call

info@gr1d.us

South Houston, TX

© 2026 GR1D. All rights reserved.

AI Data Center Infrastructure — Build, Host, Compute