About

Market

Operations

Insights

Contact

Schedule a Call

GPU Colocation & AI Server Hosting

Host Your GPU Servers

Bespoke liquid-cooled colocation from $180/kW per month, built to your rack spec on our South Houston site, where power is already live. Placing GPU orders? Reserve your rack space today for liquid-cooled GB300 and Vera Rubin.

Direct-to-chip liquid cooling. N+1 power redundancy. 50–100+ kW per rack. Data center modules deliver about 6 months from order.

Reserve Rack Space

Schedule a Call

Starting at

$180

/kW/month

Bespoke liquid-cooled colocation · live power in South Houston

Committed power from 10 kW to 100+ kW per rack

Direct-to-chip liquid cooling for GB300 and Vera Rubin

N+1 redundant power and cooling

Carrier-neutral connectivity

24/7 on-site security and remote hands

Data center modules deliver about 6 months from order

Reserve Rack Space

Infrastructure

Purpose-Built for GPU Workloads

Not a retrofitted office building. GR1D's data center modules are built to order for high-density AI compute — the power, cooling, and connectivity your GPUs demand.

High-Density Power

Support 10 kW to 100+ kW per rack with dedicated power circuits. Purpose-built for GPU-heavy AI workloads that draw far more power than standard servers.

Liquid Cooling Ready

Advanced cooling infrastructure designed for next-generation GPU deployments. Rear-door heat exchangers and direct-to-chip liquid cooling available for high-density racks.

N+1 Redundancy

Redundant power feeds, UPS systems, and cooling capacity ensure your AI workloads run without interruption. Designed for 99.99%+ uptime.

Carrier-Neutral Connectivity

Multiple fiber providers, cloud on-ramps, and cross-connect options. Low-latency paths to AWS, Azure, and GCP for hybrid AI deployments.

Physical Security

24/7 on-site security, biometric access control, CCTV monitoring, and individual cabinet locks. SOC 2 compliance-ready infrastructure.

Remote Hands & Support

On-site technicians available 24/7 for hardware swaps, cable management, reboots, and troubleshooting. Reduce your need for travel and on-site staff.

Availability

Not the Cheapest. Available.

In 2026 the constraint is capacity, not price. Primary-market colocation vacancy hit a record 1.4% at the end of 2025. GR1D has live power in South Houston today and builds liquid-cooled capacity to your rack spec in about 6 months from order.

MarketTypical $/kW/mo20 kW Rack/moNotes
GR1D — South HoustonFrom $180From $3,600Live power now · liquid-cooled modules ~6 months from order
Dallas / Texas$140–240$2,800–4,800DFW vacancy under 1%
Ashburn / N. Virginia$180–300$3,600–6,000~7-year wait for 100 MW of new grid power
Silicon Valley$200–350$4,000–7,000Highest cost market
Chicago$160–260$3,200–5,200Mid-tier market
Phoenix / Arizona$130–220$2,600–4,400Growing market

Market pricing from QuoteColo, Brightlio and industry reports (March 2026). Vacancy: CBRE (year-end 2025), JLL (DFW, Aug 2026). Northern Virginia power wait: JLL (Jul 2026). Actual pricing varies by density, term and configuration.

Who This Is For

Capacity for GPU Teams

AI Companies Running Inference

You have GPU servers running 24/7 inference workloads. Cloud costs are eating your margin. Move to colocation for predictable, lower-cost hosting with bare-metal performance.

Typical savings: 40-60% vs cloud

Teams Outgrowing Cloud GPU

Your AWS or GCP GPU bill crossed $10K/month and keeps climbing. Colocation gives you dedicated hardware at a fraction of the cost — with no shared tenancy or noisy neighbors.

Break-even: typically 3-6 months

Enterprises Needing Data Control

Regulatory requirements, data sovereignty, or IP protection demand physical control of your hardware. GR1D provides dedicated cabinets with biometric access and compliance-ready infrastructure.

SOC 2 compliance-ready

Teams Placing GPU Orders

Your GB300 or Vera Rubin order has a delivery date. Reserve liquid-cooled rack space now: power is live on our South Houston site and data center modules deliver about 6 months from order, so your racks are ready when the hardware lands.

Reserve rack space today

Go deeper

Planning for Liquid-Cooled Racks

Design · 14 min read Liquid Cooling for GPUs: Why Air Stops Near 40 kW Liquid cooling data center guide: why air stops near 40 kW, direct-to-chip vs immersion, CDU flow math, 45 °C loops and Texas water rules for AI racks. Read the guide

Design · 11 min read 800 VDC Data Centers and Vera Rubin, Explained 800V DC data center design for developers: why 54 V fails at 1 MW per rack, NVIDIA's 2026–2029 roadmap, NEC 2026, cost per MW and a shell checklist. Read the guide

Development · 13 min read Powered Shell vs Turnkey vs Colocation Explained Powered shell data center vs turnkey vs colocation: who builds what, who owns the plant, and 2026 costs from $584k/MW powered land to $17.6M/MW all-in. Read the guide

All GR1D Insights

Get Started

Reserve Rack Space

Tell us about your GPU order, delivery date and power per rack. We'll reply within 24 hours with a quote and a module delivery timeline.

Schedule a Call

Walk through your GPU delivery dates, rack density and module timeline with the GR1D team.

Book a Call

What's Included

Liquid-cooled capacity from $180/kW/month

Full 42U–52U cabinet options

Redundant power and cooling

Carrier-neutral connectivity

24/7 remote hands support

No setup fees for 12+ month terms

Or email us directly

info@gr1d.us

AI data center infrastructure — from raw land to GPU-ready racks. Build, host, or rent compute at scale.

GR1D on LinkedIn

GR1D on YouTube

GR1D on Instagram

Products

Build Your AI Factory

Host Servers

Rent Compute

Company

About GR1D

Operations

Market

Sites

FAQ

Insights

Get in Touch

Schedule a Call

info@gr1d.us

South Houston, TX

© 2026 GR1D. All rights reserved.

AI Data Center Infrastructure — Build, Host, Compute